500m3/h Vertical Pump Restoration Process: Addressing Shaft Deformation & Housing Damage
In heavy industrial facilities such as steel mills, a 500m3/h vertical pump is a critical operational asset. When this equipment experiences a serious technical failure, the entire production line can be affected. The Thái Khương Services (TKS) team recently received and resolved a case of severely damaged vertical pump, restoring the equipment to standard operating condition through an in-depth workshop restoration process. 
Condition Assessment: Severe Technical Damage
Upon receipt at the workshop, the TKS technical team inspected and recorded the complex damage condition of the pump:
- Pump shut down: The pump shaft was unable to operate.
- Cascading damage: The entire bearing housing system and mechanical seals were severely damaged.
- Shaft deformation: The pump shaft was twisted and deformed due to an operational failure.
- Heavily worn components: Bushings and shaft sleeves were damaged and deformed.

Advanced Restoration Process by Thái Khương Services (TKS)
Faced with severe damage, a simple “replacement” solution is not always optimal in terms of cost and lead time. TKS deployed an in-depth workshop restoration process to proactively address the issue.
Step 1: Disassembly and Damage Analysis
The entire pump was disassembled and each component inspected thoroughly to accurately assess the extent of damage and develop a detailed restoration plan.
Step 2: Workshop Machining & Restoration — Cost-Effective Solution
This is a core capability of TKS. Rather than waiting for new spare parts to be imported, our engineers:
- Remachined the pump shaft: Restored the pump shaft from a twisted, deformed state back to standard tolerances.
- Restored the bearing housing: Machined and restored the heavily worn bearing housing.
- Renewed bushings & sleeves: Fully remachined all deformed bushings and shaft sleeves.
Step 3: Mechanical Seal Restoration and Testing
The mechanical seals (a key component) were not only repaired but also subjected to a dedicated pressure test bench. This process ensures 100% seal integrity before assembly, eliminating the risk of leakage during operation.
Step 4: Assembly, Alignment, and Final Finishing
After all components were restored, the TKS team proceeded with complete assembly. This stage demands high precision:
- Calibration and adjustment of all clearances and technical tolerances.
- Installation of newly tested and certified mechanical seals.
- Full cleaning and repainting of the entire pump, returning the equipment to like-new condition.

Benefits of Choosing TKS In-Depth Restoration
Through this case study, the TKS solution delivered 3 clear benefits for the customer:
- Cost Efficiency: Workshop restoration costs are significantly lower than full replacement of the shaft assembly, seals, and housing.
- Timeline Control: No dependence on import lead times for spare parts, enabling the plant to bring the pump back online quickly.
- Performance Assurance: Thanks to the inspection process (seal pressure testing) and precision alignment, the pump’s performance is restored to its original condition.
Operational Recommendations from TKS Engineers
To ensure long-lasting operation after repair, TKS always recommends that customers:
- Monitor and prevent the pump from running dry.
- Periodically check and monitor bearing temperature, vibration levels, and current draw.
- Change lubrication oil every 1,000 hours of operation.
- Re-check shaft alignment after the first 12 hours of operation.

Contact TKS for Professional Industrial Pump Repair Services
If your pump system is experiencing a failure — from minor issues to complex damage such as shaft deformation, worn housing, or seal failure — contact the Thái Khương Services (TKS) team. We have a dedicated workshop, specialized equipment, and skilled engineers to restore your equipment.

Send Your Service Request to TKS for Immediate Consultation!