Hotline
Hotline 24/7 0941 400 488 Call now — free
Zalo
Free consultation Chat Zalo Response within 5 minutes
Caprari IT · Aerzen DE · DOOCH KR
HVAC & Chiller Pump Solutions

Chiller Pump
30% energy savings

Inline, end-suction and VFD booster pumps with IE3/IE4 motors for commercial buildings, industrial zones and data centers — European standards, full submittal documentation for MEP design.

IE3 / IE4 Motor EuroVent LEED Compatible CE / ISO 9001
Typical applications
High-rise building Commercial center Data Center Hotel Factory
📸 Product Photo 860 × 540px · 16:9
Products
Caprari vertical inline pump in chiller plant room — body painted Caprari blue, IE3/IE4 motor visible, mounted on main pipe DN150-DN200
Logo
Caprari logo on pump body + TKT Pumps watermark bottom right corner
Headline
No text overlay — visual focus on IE4 motor badge
Key Points
IE4 motor badge · VFD inverter visible · Pressure gauge · Vibration mount
Mood
Clean technical room, cool blue lighting, insulated pipes — clean, technical, professional
Source
Caprari catalogue 2023 / Project photo data center or commercial high-rise
30% Savings
energy
100+ HVAC project
commercial
IE4 Efficiency motor
premium
Pain points · HVAC engineering

Why is your HVAC system burning money ?

4 common issues in chiller plant and commercial HVAC operation — and how TKT's high-efficiency IE3/IE4 pumps address them at the root.

01 / Energy Cost

HVAC electricity bills 25–30% too high

Legacy IE2 pumps consume approximately 25% of total HVAC energy. In high-rise buildings, the chiller pump system runs 24/7 without optimized loading — no VFD, no match to actual cooling load. The longer they run, the more energy they waste.

Impact Hundreds of millions VNĐ in losses per year for a 20-storey building
02 / Noise & Vibration

Noise and vibration at the mechanical floor

Pumps lacking inline isolation, improper anti-vibration mounts, and rigid piping transmit vibration into the building structure. Tenants on upper floors complain and property NPV decreases — especially in hotels and upscale condotels.

Impact Tenant complaints, costly retrofits, loss of project reputation
03 / Flow Imbalance

Uneven cooling load distribution across floors

Fluctuating chilled water flow — upper floors under-cooled, lower floors over-cooled, chillers running at full capacity. Root causes: no VFD on pumps, no DPS sensors, improperly set balancing valves.

Impact Poor occupant comfort, 15–20% chiller capacity wasted
04 / Reliability

Pump failure = chiller failure = lost uptime

Data centers, hospitals, 24/7 manufacturing plants — a single chiller pump failure means loss of cooling, server downtime, vaccine spoilage, production line shutdown. Systems without hot-standby and condition monitoring carry significant risk.

Impact 1 hour of data center downtime = average loss of 9,000 USD/minute
Solutions · 4 HVAC Pump Groups

Four pump groups for any location in HVAC systems

From chiller primary loop, secondary loop, condenser loop to cooling tower and AHU blower — TKT supplies the complete range from a single source.

IE3 / IE4 Premium Efficiency
📸 Product Photo · 01 560×320 · 7:4
Subject
Caprari CVX/PMX vertical inline pump — navy blue body, IE3/IE4 motor mounted on top, flange DN50–DN150 visible
Layout
Standing vertical · 3/4 view · eye-level
Background
Clean white technical room · PIR insulated pipes
Lighting
Cool white 5000K · cyan LED accent along the pipe
Source
Caprari catalogue 2023 CVX/PMX · render 3D · stock backup
↳ Replace with actual Caprari product photo
01 · Inline Pump

Vertical Inline Pump — Space-Saving

Brand: Caprari Italy · 100% IE3/IE4 motor

Vertical inline pump mounted directly on the main pipeline, no separate baseplate required — ideal for compact chiller plant rooms and multi-storey high-rises.

Featured series
Caprari CVX PMX HMU HMC
Chiller primary & secondary loop (4–12°C)
Hot water re-circulation building
Range: 5–500 m³/h · 10–80m head
Spec policy: Refer to datasheet Caprari — TKT engineers select the model according to project flow rate & head
📸 Product Photo · 02 560×320 · 7:4
Subject
Caprari NC end-suction horizontal pump on concrete base · large IE3 motor on right · impeller housing visible
Layout
Horizontal · side view · ground level
Background
Industrial pump room · gray epoxy floor · large pipes DN200-DN300
Lighting
Bright neutral 5000K · highlight motor metal · medium contrast
Source
Caprari NC Series brochure · MEC-MR catalogue · project condenser loop photo
↳ Replace with Caprari NC/MEC-MR product photo
02 · End-Suction Centrifugal

Horizontal Centrifugal Pump — Multi-Stage

Brand: Caprari NC / MEC-MR Italy

End-suction and multi-stage horizontal pumps for high-rise buildings, high-heat-load condenser loops — high head, stable efficiency, easy maintenance.

Featured series
NC Series MEC-MR MEC-MG NCH
Condenser water loop (cooling tower)
High-rises > 20 floors — multi-stage high head
Range: 10–1000 m³/h · 20–200m head
Spec policy: Caprari datasheet — flow/head/η% verified per catalogue
📸 Product Photo · 03 560×320 · 7:4
Subject
DOOCH MQ-Series multi-inverter booster · 3 vertical multistage stainless steel pumps song song · color touchscreen panel · pressure sensor
Layout
Compact skid · 3/4 view · highlight DOOCH stainless body + VFD integrated
Background
Plant mechanical room · white insulated pipes · floor epoxy gray
Lighting
Bright neutral · highlight stainless steel pump body · minimal shadow
Source
DOOCH Pump catalogue MQ/XQP series · Caprari Booster catalogue · render 3D
↳ Replace with DOOCH MQ/XQP booster photo
03 · Booster + VFD

VFD Booster Set — Smart load

Brand: DOOCH Korea · Caprari Booster Italy

A set of 2–6 vertical multistage stainless steel pumps with VFD control — DOOCH MQ/XQP Series integrates VFD in each pump, soft start, maintains stable pressure, saving up to 50% energy compared to full-load operation.

Featured series
DOOCH MQ-Series XQP-Series XQ-XR(L) NSQP Caprari Booster
Domestic water supply for high-rise buildings · up to 250m head
Chiller secondary loop with variable flow control
Soft start · constant pressure · 50% energy saving
Spec policy: DOOCH catalogue MQ/XQP series — TKT configures according to flow rate + head + number of standby pumps
📸 Product Photo · 04 560×320 · 7:4
Subject
Aerzen Delta Blower in dark gray acoustic enclosure · clear "AERZEN" markings · inlet/outlet flanges side
Layout
Enclosed unit · front 3/4 view · ground placement
Background
Clean industrial · cooling tower hint background blur · concrete pad
Lighting
Cool daylight · highlight Aerzen logo · subtle blue rim light
Source
Aerzen Delta brochure · Aerzen Performance³ press kit · Robuschi RBS photo
↳ Replace with Aerzen Delta blower product shot
04 · Blower & Air System

HVAC Air Blower — Cooling Tower & AHU

Brand: Aerzen Germany · Salvatore Robuschi Italy

Rotary lobe and screw blowers with German technology for cooling tower aeration, AHU fresh air supply, pressurization — Aerzen Delta & Performance³ is a premium choice, 20+ year durability, IE3/IE4 motor std.

Featured series
Aerzen Delta Blower Delta Hybrid Performance³ VM/VMX Robuschi RBS
Cooling tower aeration
AHU fresh-air & pressurization
Range: 100–10.000 m³/h · 200–1000 mbar
Spec policy: Aerzen catalogue Delta/Performance³ — selection per air flow & pressure rise
Brand portfolio · HVAC partners

Four strategic brands for a complete HVAC system

Caprari · Aerzen · DOOCH · Salvatore Robuschi — covering chiller pumps, VFD boosters and German-technology blowers. One supplier, one standard.

4 Brands
strategic
240+ Yrs exp.
total
IE4 Motor
premium
Featured Projects · HVAC Portfolio

Partnered with 100+ Buildings in Vietnam

Commercial high-rises, 5-star hotels, data centers, industrial zones — TKT supplies Caprari, Aerzen, DOOCH pumps for both new builds and retrofits.

Office Tower
Photo · 640×400 · 8:5
Subject
Class A Office Tower · upward-angle view · blue reflective glass
Mood
Premium · modern · vertical lines
Source
Project photo HCM · Unsplash "office tower vietnam"
↳ proj-01-office.webp

Class A Office Tower

Ho Chi Minh City · 30 floors

Caprari NC + CVX cluster for chiller primary & secondary loop, booster for high-rise domestic water. N+1 redundancy system.

Pumps 12 sets
Cooling 2400 TR
Year 2023
Brand Caprari
Data Center
Photo · 640×400 · 8:5
Subject
Server room rack rows · cooling pipe overhead · cool blue LED lighting · no people
Mood
Mission critical · cool blue · tech aesthetic
Source
Viettel/FPT datacenter (licensed) · stock data center
↳ proj-02-datacenter.webp

Tier III Data Center

Hanoi · 5000m²

Hot-standby N+1 configuration, Caprari CVX inline + auto-switch panel for chiller precision cooling 24/7 mission critical.

Pumps 8 sets N+1
IT Load 3 MW
Uptime 99.99%
Brand Caprari · Aerzen
5* Hotel
Photo · 640×400 · 8:5
Subject
5-star beachfront hotel, Da Nang · facade or premium lobby chiller plant
Mood
Luxury · clean · subtle · beach blue
Source
Marriott/Sheraton press · Unsplash "luxury hotel da nang"
↳ proj-03-hotel.webp

International 5-Star Hotel

Da Nang · 350 rooms

Caprari MEC-MR multi-stage for SPA hot water + high-rise booster, premium vibration isolation for a quiet mechanical room.

Pumps 10 sets
Floors 28 floors
Noise <55 dB
Brand Caprari
Shopping Mall
Photo · 640×400 · 8:5
Subject
TTTM atrium glass roof · escalators · multiple floors · daylight
Mood
Big · bright · public · open space
Source
Vincom/AEON press · Pexels "shopping mall atrium"
↳ proj-04-mall.webp

Large Shopping Mall

TP.HCM · 80,000m²

Condenser water pump system for cooling tower & chiller primary, Aerzen Delta blower for cooling tower aeration.

Pumps 15 sets
Cooling 3500 TR
Year 2022
Brand Caprari · Aerzen
Industrial Park
Photo · 640×400 · 8:5
Subject
Aerial drone shot, Binh Duong Industrial Zone · rows of factory buildings white roofs · blue sky
Mood
Industrial · clean · technical · scale
Source
VSIP/Amata press · drone shot freelancer · stock industrial park
↳ proj-05-industrial.webp

High-Tech Industrial Zone

Binh Duong · 50 ha

Chiller water cluster for 4 electronics manufacturing plants — Caprari NC high-volume + Robuschi blower for process ventilation.

Pumps 20+ sets
Cooling 5000+ TR
Shift 24/7
Brand Caprari · Robuschi
Mixed-use Tower
Photo · 640×400 · 8:5
Subject
45-floor office + residential complex, Hanoi · evening view · LOTUS Gold cert
Mood
Mixed-use · warm windows · premium
Source
Vinhomes/Sunshine press · stock "high-rise tower hanoi"
↳ proj-06-mixed.webp

Office & Residential Complex

Hanoi · 45 floors

DOOCH MQ-Series high-rise booster for domestic water + Caprari CVX for chiller, LOTUS Gold certified — 45% booster energy savings.

Pumps 14 sets
Floors 45 floors
Cert LOTUS Gold
Brand Caprari · DOOCH
No projects in this category.
Need references for similar projects? TKT provides detailed case studies, reference BOQ, and owner contact for verification.
Xem case study →
Why TKT · Trust factors

Why MEP & HVAC Contractors choose TKT?

5 specific reasons — from 19+ years of experience, on-site technical service to Green Building documentation support.

Track Record · Verified

19+ years — 3000+ projects
industrial & commercial

19+ Years of experience
in Vietnam
3000+ Projects completed
deployed
17 Brands
distribution
100+ HVAC project
commercial
01

Complete HVAC Portfolio from a Single Supplier

4 strategic brands (Italy/Germany/Korea), complete Inline · End-suction · Booster VFD · Blower — fewer vendors, simplified procurement, unified spare parts.

4 brands One-stop-shop
02

Engineering support cho MEP design

HVAC engineering team in Ho Chi Minh City & Hanoi — supporting pump selection, submittal packages, BIM Revit families. Consultant response within 48h.

Local engineer Revit · BIM 48h response
03

On-Site Spare Parts & Commissioning

Kho spare bearing/seal/impeller/VFD card cho Caprari, Aerzen and DOOCH in Ho Chi Minh City — on-site commissioning, balancing and troubleshooting engineers, 24/7.

Local stock On-site service
04

Green Building & LEED documentation

Submittal support for LEED EAp2, EAc3, LOTUS Vietnam — supporting 15+ LEED Gold & Platinum and LOTUS Gold projects in Vietnam.

LEED v4 LOTUS 15+ projects
05

Service contract & predictive maintenance

Periodic maintenance contracts + condition monitoring with vibration and temperature sensors. Early fault detection to prevent downtime — especially for data centers and mission-critical applications.

SLA available IoT monitoring
Process · 5-Step HVAC Pump Selection

From calculated load to commissioning

TKT's standard 5-step process for every commercial HVAC project — ensuring pumps match the load, correct configuration, stable operation from day one.

01

Receive Cooling Load & Project Parameters

MEP design provides BTU/TR, chiller plant diagram, building type, number of floors, mechanical room location.

Required input Cooling load (TR / kW) Chiller Piping Diagram Design ΔT
02

Calculate Flow Rate + Head

TKT engineers calculate Q (m³/h) & H (m) for each loop, check NPSH-a, select duty point.

Deliverable Pump duty schedule NPSH analysis Operating curve
03

Select IE3/IE4 Motor + VFD

Match pump curve + IE3/IE4 motor, select VFD for secondary loop, calculate energy-saving ROI.

Deliverable Model selection VFD spec Energy ROI report
04

Submittal pack cho MEP

Cut-sheet, performance curve, dimensions, wiring, IOM, Revit family — reviewed by consultant.

Deliverable Submittal book PDF Revit / CAD files LEED documentation
05

Commissioning & balancing

TKT engineers on-site for installation, pressure testing, floor-by-floor flow balancing, and operator training.

Deliverable Commissioning report Balancing data Operator training
Dedicated specialist · Direct contact

Two specialists HVAC & Building
ready to consult on your project

No switchboard. No generic sales. Speak directly with the engineer responsible for HVAC pump & chiller plant — response within 24h.

Technical expert in charge
Portrait
200×200

Senior HVAC Engineer
(TODO: HR to provide name)

Application Engineer · HVAC & Chiller

📸 Portrait Brief · 01 200×200 · 1:1 crop circle
Framing
Head & shoulders · eye-level · 80% look-at-camera
Wardrobe
TKT navy polo / smart-casual shirt xanh
Background
Studio gray gradient or office blur · cool tone
Lighting
2-light setup soft key · subtle blue rim
Expression
Confident half-smile · authoritative · approachable
Source
Photo shoot TKT office (preferred) · LinkedIn pro photo
↳ assets/experts/expert-01-hvac-engineer.webp
12+ Yrs exp.
HVAC
60+ Projects
commercial
4 Brand cert
Caprari · DOOCH
Chiller plant Caprari NC/CVX DOOCH VFD booster LEED submittal BIM / Revit
"Every commercial HVAC project requires matching cooling load, NPSH and VFD logic. I help MEP designers finalize pump schedule + booster configuration within 48h."
Technical expert in charge
Portrait
200×200

Systems Specialist
(TODO: HR to provide name)

System Specialist · Blower & Building Service

📸 Portrait Brief · 02 200×200 · 1:1 crop circle
Framing
Head & shoulders · standing arms crossed · authoritative
Wardrobe
TKT navy polo · sleeve rolled up casual
Background
TKT showroom blur · spare parts wall blur · cool blue
Lighting
Bright key + blue rim · slight contrast
Expression
Friendly nod · expert assurance · slight smile
Source
Photo shoot TKT showroom (preferred) · company database
↳ assets/experts/expert-02-system-specialist.webp
10+ Yrs exp.
building
40+ Projects
blower/AHU
3 Brand cert
Aerzen · Robuschi
Aerzen Delta Performance³ Cooling tower AHU pressurization Service contract
"Aerzen is the gold standard for HVAC blowers. I help you set up the SLA, condition monitoring and warehouse spare parts for 24/7 projects."
12-month warranty Spare parts stock On-site commissioning LEED documentation 24h response
Công ty TNHH Thái Khương — TKT Pumps
19+ years in industrial pumps · 3000+ projects · 17 European brands
Graphic Design Brief · For visual designer / AI image generation Banner · 21:9 · 2200×940px
Visual Concept

Premium Chiller Plant Room
European standards

Image of a modern chiller mechanical room — 2–3 Caprari vertical inline pumps painted navy blue standing in parallel on the main pipe, connected to the chiller package at the rear. Professional cool blue lighting, clean epoxy floor, white PIR-insulated pipework.

🏢 Building MEP room 💧 Caprari blue body ❄️ Cold blue lighting 📐 Vertical inline rows 🌡️ Insulated piping ⚡ IE4 motor badge
Subject 3 Caprari vertical inline pumps in the chiller plant — 3/4 view angle, eye-level, slight depth of field.
Mood Clean · technical · cool · premium — not too "cyber", maintaining a professional technical feel.
Lighting Cool white (5000K) ambient + cyan accent from LED strip along the pipes, minimal harsh highlights.
Palette
#0E5BA8 #00C2D1 #0A1828 #F5F9FC #EF7D00
Logo TKT Pumps watermark Bottom right corner · 8% width · 60% opacity white.
Typography Be Vietnam Pro Black title overlay · uppercase · tracking -2%. Tagline mono JetBrains Mono.
Source Caprari brochure 2023 · project photo Lim Tower / Bitexco / FPT Tower / Viettel data center · Stock alt: Unsplash "data center pump room".
Key Selling Points · 6 reasons

Why MEP Design & HVAC Contractors
choose TKT Pumps?

Six specific values TKT delivers for your HVAC project — from design to operation, compliant with Green Building standards.

01
Energy Save

IE3/IE4 Motor + Integrated DOOCH VFD

100% of pumps Caprari / Aerzen use IE3/IE4 motors (IEC 60034-30-1). Pumps DOOCH with integrated VFD in each pump — soft start + constant pressure, saving up to 50% energy.

−30% Power consumption
compared to IE2 + non-VFD
02
MEP Ready

Complete Submittal Pack for MEP Design

Cut-sheet, performance curve, dimension drawing, wiring diagram, IOM manual — internationally standard submittal package, ready for consultant review within 48h.

48h Submittal package
delivery
03
BIM · CAD

BIM & CAD Models Available for Revit

Revit family library, AutoCAD 2D/3D blocks, IFC, STEP — integrate into the project model in minutes. Helps MEP designers finalize chiller room layout 50% faster.

100% Caprari series
Revit files available
04
LEED v4

Green Building & LEED Documentation Support

Documentation for LEED EAp2 (Energy Performance), EAc3 (Enhanced Commissioning), MRc4 (Material Reuse) — compliant with LOTUS Vietnam and international LEED v4.

15+ LEED Gold Projects
& Platinum supported
05
24/7

N+1 Configuration — Hot-Standby for Mission-Critical

N+1 redundancy pump cluster design with auto-switch on primary pump failure — suitable for data centers, hospitals, 24/7 manufacturing plants.

99.99% Uptime achieved
with N+1 applied
06
Service

Technical Service & Spare Parts in Ho Chi Minh City

Certified engineers Caprari, Aerzen, DOOCH in Vietnam. Spare bearing, seal, impeller, VFD card available 24/7. Commissioning, balancing, troubleshooting on-site.

<24h Technical response
Ho Chi Minh City area
Infographic · Chiller Plant Diagram

Pump position in HVAC system

Each position in the chiller plant requires a different pump type — the diagram below helps MEP designers and HVAC contractors select the right one from the start.

Custom Illustration · SVG

Isometric chiller plant schematic

Vector illustration of the full chiller plant — 30° isometric view, showing: cooling tower (outdoor), chiller package, primary loop, secondary VFD pumps, floor-by-floor AHU/FCU, blue + orange pipe network, flow direction arrows.

🌡️ Cooling tower ❄️ Chiller package 🔵 Primary loop 🟠 VFD secondary 🏢 AHU floors ➡️ Flow arrows
Tools: Figma + Vectary plugin · Adobe Illustrator isometric · Blender low-poly
Type
Isometric vector infographic — SVG preferred · PNG fallback
Dimension
1200 × 560px · 15:7 ratio wide
Style
Modern flat · line thickness 2px · minimal shadow
Labels
JetBrains Mono 10–12px uppercase · temperature of each component (7°C / 32°C)
Palette
#0E5BA8 #00C2D1 #FF8A3D #F5F9FC #0A1828
Source
Custom design (recommended) · adapt Caprari/Trane schematic · Freepik isometric
Inline Pump (Caprari) End-Suction (Caprari NC/MEC) Booster + VFD (DOOCH · Caprari) Blower (Aerzen · Robuschi)
01

Chiller (Water Cooled)

7 °C → 12 °C

Central chiller — produces chilled water for the entire building's air conditioning system.

Built-in pump
Internal recirc
02

Primary Chiller Loop

7 °C constant flow

Primary loop between chiller and buffer tank — constant flow rate, stable pressure.

Suitable pump
Inline Pump · IE3
03

Secondary Loop (VFD)

7 °C → AHU/FCU

Secondary loop distributing chilled water to AHU/FCU on each floor — variable flow rate according to load.

Suitable pump
Booster + VFD · IE4
04

Cooling Tower + Condenser

32 °C → 37 °C

Cooling tower and condenser water loop — rejecting heat to the environment.

Suitable pump
End-Suction NC
📊 Pump Selection Matrix by HVAC Application
Quick reference — details by project
Applications Pump type Brand · Series Reference range
Chiller primary loop
Vertical Inline Caprari CVX / PMX 10–400 m³/h · 15–60m
Chiller secondary loop (VFD)
Multi-Inverter Booster DOOCH MQ-Series 2–6 pumps · built-in VFD
Condenser water (cooling tower)
End-Suction Centrifugal Caprari NC Series 50–1000 m³/h · 10–50m
Domestic hot water re-circ
Inline / Multi-stage Caprari MEC-MR 5–80 m³/h · 30–150m
Domestic water booster high-rise
VFD Multistage Booster DOOCH XQP / XQ-XR(L) 5–60 m³/h · 50–250m
Cooling tower aeration
Rotary Lobe Blower Aerzen Delta · Performance³ 100–10000 m³/h · 200–800 mbar
AHU pressurization / fresh air
Rotary Lobe / Screw Blower Aerzen Delta Hybrid 100–8000 m³/h · 300–1500 mbar
Industrial High-Pressure · High-pressure
VFD Inverter SS304/316 DOOCH NSQP / SQ-DHF(T) 2–40 m³/h · 100–250m
Data center precision cooling
Inline N+1 redundant Caprari CVX · hot-standby 20–200 m³/h · 24/7 critical
Công cụ chọn bơm TKT

Chọn nhanh bơm HVAC / chiller theo thông số của bạn

Kéo 2 thanh thông số — nhận ngay dòng bơm phù hợp từ danh mục chính hãng EU/G7, kèm mức độ phù hợp và báo giá kỹ sư trong 24h.